Describe the discharge destination
Ask the responsible local authority to review any site-specific discharge requirements.
Keep servicing accessible
Document the party responsible for monitoring and arranging collection throughout the lease.
Include collection in the first site sketch
- The proposed collection or receiving-system connection
- The party monitoring used-water levels during the project
- The access needed for collection vehicles and maintenance