Map the connection route
Share any site-specific heat or material exposure information with the qualified installation team.
Review suitable components
Keep inspection access in the layout so temporary lines can be checked during the project.
Keep temporary lines clear of industrial hazards
- The line route relative to hot equipment and vehicle crossings
- Known temperature and material exposures in the operating area
- The installer selecting components and inspecting the connection