01

Request the proposed fixture details

Avoid applying an advertised fixture figure to every model or assuming it represents the whole site demand.

02

Include all replenishment needs

Compare water storage and delivery arrangements against the project schedule before selecting an equipment package.

03

Compare actual equipment specifications

  • The fixture information for the equipment actually proposed
  • Shower, handwashing, and cleaning demand across the schedule
  • The storage and replenishment arrangement for the complete installation