01

Map the outage sequence

Explain where staff can reach the temporary facilities without entering the renovation area.

02

Coordinate temporary connections

Schedule the temporary handover before the existing wash facilities are removed from service.

03

Coordinate hygiene access with utility outages

  • The sequence of planned water, power, and drainage outages
  • The temporary connections available during each renovation stage
  • The handover before existing staff wash facilities close