01

Identify the connection owner

Share the trailer requirements with the qualified installer.

02

Document the approved arrangement

Keep the connection accessible for checks and servicing.

03

Coordinate with the water system owner

  • The water-system owner and approved temporary connection point
  • The installer receiving the actual trailer requirements
  • The project-specific inspection and connection documents to retain